Click me
Transcribed

Upgrading London's Sewer Systems: Past, Present, Future

LONDON'S VICTORIOUS SEWER SYSTEMS 1858 2013 2.5 i MILLION 8TM POPULATION MILLION AND GROWING. 318M EST £4.1B CONSTRUCTION THAMES BRICKS TIDEWAY TUNNEL ENLAND M £4.3 OVERFLOW PROTECTION 1859 M MILLION 96% 7:2M 1870 EST. PRESENT CAPACITY SOURCES: MME RAIN OVERFLOW thameswater.co.uk/about-us/8877 htm ncetunnelling.co.uk/_data.assets/pdf_file/0004/ 316498/Thames.pdf +2M londoncouncils gov.uk/policylobbying/enviranment watersewerage/tidywaytunnel.htm thameslondonoonsultation.co.uk 1.8B SEWAGE 39M TONNES thameswater.co.uk/about-us/10092.htm bbc.co.uk/england/sevenwonderslondon/sewers_mm Nindex.shtml PRODUCED BY: G.D.S. SEWAGE PROCESSED EVERY DAY DISCHARGED INTO THAMES every ytar Express Drainage Solutions 2010 2020 35-75M

Upgrading London's Sewer Systems: Past, Present, Future

shared by expressdrainage on Jun 16
188 views
0 shares
0 comments
Comparing the construction, capacity & cost of the new Thames Tideway Tunnel against London's pioneering Victorian sewage system.

Tags

london

Category

History
Did you work on this visual? Claim credit!

Get a Quote

Embed Code

For hosted site:

Click the code to copy

For wordpress.com:

Click the code to copy
Customize size