Click me
Transcribed

BP Oil Relief Plan Infographic

RELIEF WELL #2 DISCOVERER ENTERPRISE DRILL SHIP Development Driller Il Original MC 252 #1 Subsea Containment RELIEF WELL #1 Development Driller II Spudded May 2nd at 15:27hrs 4CSG-36 Seabed Depth: 5,249' RKB 4CSG 28 5,000 ft. 4CSG-36 4CSO-28 CURRENT PROGRESS 4CS0-18 28" Casing String Set & Cemented In Place Depth Reached: 8,788' - 12:00 May 7th Currently Running 22" Casing - 12:00 May 7th 10,000 ft. 4CSG-18 LNR-13 5/8 CSG-16 LNR-13 5/8 NR135/8 bp UNR-11 7/8 DIRAL7/8 LNR 9/8 Planned Intersection Depth: +18,000' MD-RKB OVERVIEW BP intends to drill two wells designed to intersect the original wellbore above the oil reservoir. This will allow heavy fluid to be pumped into the well which will stop the flow of oil from the reservoir. Cement will then be pumped CSG 7 ARESERVOIR 15,000 ft. down to permanently seal the well. RELIEF WELLS & SUBSEA CONTAINMENT RELIEF WELL #2 DISCOVERER ENTERPRISE DRILL SHIP Development Driller Il Original MC 252 #1 Subsea Containment RELIEF WELL #1 Development Driller II Spudded May 2nd at 15:27hrs 4CSG-36 Seabed Depth: 5,249' RKB 4CSG 28 5,000 ft. 4CSG-36 4CSO-28 CURRENT PROGRESS 4CS0-18 28" Casing String Set & Cemented In Place Depth Reached: 8,788' - 12:00 May 7th Currently Running 22" Casing - 12:00 May 7th 10,000 ft. 4CSG-18 LNR-13 5/8 CSG-16 LNR-13 5/8 NR135/8 bp UNR-11 7/8 DIRAL7/8 LNR 9/8 Planned Intersection Depth: +18,000' MD-RKB OVERVIEW BP intends to drill two wells designed to intersect the original wellbore above the oil reservoir. This will allow heavy fluid to be pumped into the well which will stop the flow of oil from the reservoir. Cement will then be pumped CSG 7 ARESERVOIR 15,000 ft. down to permanently seal the well. RELIEF WELLS & SUBSEA CONTAINMENT RELIEF WELL #2 DISCOVERER ENTERPRISE DRILL SHIP Development Driller Il Original MC 252 #1 Subsea Containment RELIEF WELL #1 Development Driller II Spudded May 2nd at 15:27hrs 4CSG-36 Seabed Depth: 5,249' RKB 4CSG 28 5,000 ft. 4CSG-36 4CSO-28 CURRENT PROGRESS 4CS0-18 28" Casing String Set & Cemented In Place Depth Reached: 8,788' - 12:00 May 7th Currently Running 22" Casing - 12:00 May 7th 10,000 ft. 4CSG-18 LNR-13 5/8 CSG-16 LNR-13 5/8 NR135/8 bp UNR-11 7/8 DIRAL7/8 LNR 9/8 Planned Intersection Depth: +18,000' MD-RKB OVERVIEW BP intends to drill two wells designed to intersect the original wellbore above the oil reservoir. This will allow heavy fluid to be pumped into the well which will stop the flow of oil from the reservoir. Cement will then be pumped CSG 7 ARESERVOIR 15,000 ft. down to permanently seal the well. RELIEF WELLS & SUBSEA CONTAINMENT RELIEF WELL #2 DISCOVERER ENTERPRISE DRILL SHIP Development Driller Il Original MC 252 #1 Subsea Containment RELIEF WELL #1 Development Driller II Spudded May 2nd at 15:27hrs 4CSG-36 Seabed Depth: 5,249' RKB 4CSG 28 5,000 ft. 4CSG-36 4CSO-28 CURRENT PROGRESS 4CS0-18 28" Casing String Set & Cemented In Place Depth Reached: 8,788' - 12:00 May 7th Currently Running 22" Casing - 12:00 May 7th 10,000 ft. 4CSG-18 LNR-13 5/8 CSG-16 LNR-13 5/8 NR135/8 bp UNR-11 7/8 DIRAL7/8 LNR 9/8 Planned Intersection Depth: +18,000' MD-RKB OVERVIEW BP intends to drill two wells designed to intersect the original wellbore above the oil reservoir. This will allow heavy fluid to be pumped into the well which will stop the flow of oil from the reservoir. Cement will then be pumped CSG 7 ARESERVOIR 15,000 ft. down to permanently seal the well. RELIEF WELLS & SUBSEA CONTAINMENT

BP Oil Relief Plan Infographic

shared by charles on May 03
969 views
2 shares
0 comments
The Deepwater Horizon oilspill in 2010 generated a bunch of crazy ideas to stop the flow of oil; including using garbage to try and plug the pipe. This graphic shows the progress through the month of ...

Source

Unknown. Add a source

Category

Environment
Did you work on this visual? Claim credit!

Get a Quote

Embed Code

For hosted site:

Click the code to copy

For wordpress.com:

Click the code to copy
Customize size