Case Study: Ferrybridge Multifuel 2

Res POWERTHERM CONTRACT SERVICES LTD www.powertherm.co.uk Case Study: Ferrybridge Multifuel 2 Project Rationale The construction of FM2 which will contribute to de-carbonising the planet by combating the waste management crisis. Project Outcome High-quality installation of thermal insulation and flexible covers, creating a safe working environment and improving the efficiency of the plant's processors. The project was completed on-time, on-budget and without safety incident. Project Details Power Generation: Contract Type: Contract Renewable Energy: Installation Energy from Waste Services: Timescale: January 2018 - January 2020 Insulation and Flexible Insulation Products Peak Workforce: 60 - Operatives, Supervisors, Project Manager, HSE Manager, QS, Commercial Manager and Admin Scope of Services Comprehensive specialist insulation services to the boiler, FGT and associated equipment, piping and ductwork to lines one and two. Assets insulated and cladded included the full air system (primary, secondary, recirculation systems), central boiler, economiser, grate, flue gas turbine, common steam piping, water steam cycle, and various vessels and tanks. To give the insulation system substantially better strength and resistance to damage, we incorporated the DUK rail substructure. All cladding fabrications were designed and manufactured at our in-house facility, then delivered to site by our dedicated logistics department. Scope of Services in Numbers (Excluding FGT) 2000+ Flexible insulation products 50-438°C Temperature range 21,000 m² Equipment cladded 11,000+ Lin/m of piping 275+ Lin/m of of round ducting insulated and cladded Site Details Location: Wakefield, U.K. The plant has the capacity to treat up to 675,000 tonnes of 675,000 Tonnes waste per annum. 180,000 The plant will produce enough energy to power around 180,000 homes. Homes Insulation performs a vitally important role across the processing and manufacturing sectors for several reasons. Not only does the insulation system improve process efficiencies, protect assets from the surrounding environment and help preserve energy and reduce costs, but importantly, provides critical personnel protection for people. Our comprehensive Industrial Insulation Service covers any application: if it's hot, freezing or loud we have the experience, knowledge & innovative technologies to suit. For more details on insulation please visit: https://www.powertherm.co.uk/services/insulation/ RES POWERTHERM nqa. nqa. nqa. CONTRACT SERVICES LTD ISO 9001 ISO 14001 ISO 45001 QUALITY MANAGEMENT ENVIRONMENTAL MANAGEMENT HEALTH & SAFETY MANAGEMENT 0114 288 9119 [email protected] www.powertherm.co.uk Francis House, Orgreave Drive, Handsworth, Sheffield, S13 9NR

Case Study: Ferrybridge Multifuel 2

shared by ObjectiveCreative on Jun 09
0 views
0 shares
0 comments
Case study of Ferrybridge Multifuel 2 Project Rationale: The construction of FM2 which will contribute to de-carbonising the planet by combating the waste management crisis. Project Outcome: High-q...

Tags

None.

Category

Other
Did you work on this visual? Claim credit!

Get a Quote

Embed Code

For hosted site:

Click the code to copy

For wordpress.com:

Click the code to copy
Customize size