Click me
Transcribed

Case Study: Carrington CCGT Power Station

RES POWERTHERM Res CONTRACT SERVICES LTD www.powertherm.co.uk Case Study: Carrington CCGT Power Station Here we take a look at one of our successful case studies involving the Carrington CCGT Power Station. PROJECT OUTCOME PROJECT Successful and safe execution of scaffolding, insulation, flexible insulation products and trace heating services for the term OUTCOME maintenance contract. PROJECT RATIONALE Unplanned and planned maintenance to vane 2. Powertherm were awarded the site maintenance contract as a result of our performance during the construction phase of the plant. During the construction stage, we completed insulation services and associated scaffolding to the boiler, gas turbine, and associated ducting and equipment to vanes 1 and 2. PROJECT DETAILS Contract Type: Industry: Power CONTRACT Maintenance generation Services: Timescale: З years Access, insulation, flexible insulation products and trace heating Workforce: Up to 30 individuals including scaffolders, insulation operatives, welders, trace heating engineers and project management SCOPE OF SERVICES Scaffolding: Flexible Insulation Products: Insulation covers were Multiple scaffolds were assembled on-site using split-line and independent structures. Areas where scaffolds were constructed inspected and cleaned where necessary. Flexible covers were also installed on-site to help protect valuable elements of the plant from damage during the outage. included the GT enclosure, OTC, boiler house (HRSG), MCW pumps, AGI, steam turbine, exhaust gas housing, feed water, HP bypass valves and the cooling towers. During scheduled outages, the structures were used by numerous contractors, before being deconstructed ready for the vane to be switched back on. Trace Heating: Full winterisation checks undergone on-site, identifying and replacing faulty electrical trace heating cables and temperature controllers from a previous contractor. We also installed electrical trace heating to two RESIN tanks for temperature maintenance, including heated flexible insulation covers. Finally, we trace heated four polymer lines for frost protection purposes. Insulation: Lagging and cladding services were carried out for general maintenance, specifically bends and the NDT, with fabrications reinstated where needed. POWERTHERM INDUSTRIAL SCAFFOLDING If you're the person responsible for placing employees on a scaffold platform, it is important that you know, and trust, the company erecting the structure. You need to be sure it is fit for purpose, and is modified and dismantled in the safest possible manner. Powertherm provides a full range of scaffolding services, using our wholly-owned equipment, both independently and as part of an integrated package with our other services. Where required, we also provide inspections and surveys, design drawings, supporting calculations and project programmes. We offer a full range of scaffold structures: Independent Birdcage Towers Slung Cantilever platforms Bridges and truss out Flying and racking Loading platform shore towers Habitats/temporary buildings and roofs Lifting frames Storage racks Edge protection and ties and buttresses Sheeted and Encapsulation/containment un-sheeted structures The Layher Allround scaffold system is our system of choice. It is a technically advanced, innovative system which allows access to all work areas; by using the purposely designed components. The main benefits of the system are focused around safety, productivity and versatility. All scaffolds are erected in accordance with the latest NASC technical and safety guidance. Our operatives hold Construction Industry Scaffolder's Record Scheme (CISRS) qualifications and we commit to continuous training to ensure the highest levels of safety and quality of service. All projects are monitored for safety and on-site auditing is undertaken by one of our highly-trained health and safety experts. To find out more information please visit: www.powertherm.co.uk/services/access Res POWERTHERM nga. nga. nga. CONTRACT SERVICES LTD ISO 9001 ISO 14001 ISO 45001 QUALITY MANAGEMENT HEALTH & SAFETY MANAGEMENT ENVIRONMENTAL MANAGEMENT +44 (0) 114 288 9119 [email protected] www.powertherm.co.uk Francis House, Orgreave Drive, Handsworth, Sheffield, S13 9NR

Case Study: Carrington CCGT Power Station

shared by ObjectiveCreative on Apr 19
0 views
0 shares
0 comments
Here we take a look at another one of our successful case studies involving the Carrington CCGT Power Station.

Category

Other
Did you work on this visual? Claim credit!

Get a Quote

Embed Code

For hosted site:

Click the code to copy

For wordpress.com:

Click the code to copy
Customize size