C-TPAT 7 Point Container Inspection
7-Point Container Inspection
1. Outside/Undercarriage
-inspect prior to entering facility
-support beams should be visible
2. Outside/Inside Doors
-secure and reliable locking mechanisms
-look for different color bonding material
-loose bolts
-plates and repairs
3. Right Side
-unusual repairs to structural beams
-repairs to the walls on the inside of the container must be visible on the outside
-use tool to tap side walls. Listen and feel for hollow sound!
4. Left Side
-unusual repairs to structural beams
-repairs to the walls on the inside of the container must be visible on the outside
-use tool to tap side walls. Listen and feel for hollow sound!
5. Front Wall
-blocks and vents are visible
-use tool to tap front wall. Listen and feel for hollow sound!
-range finder, measuring tape and/or string can be utilized to determine the length of container
6. Ceiling/Roof
-ceiling is a certain height from floor. Blocks and vents are visible.
-uncomfortable feeling inside container
-repairs to the ceiling on the inside of the container should be visible on the outside.
use tool to tap ceiling. Listen for hollow sound.
7. Floor Inside
-floor should be a certain height from the ceiling
-floor should be flat. Do not need to step up to get inside!
-different floor heights
-unusual repairs
1. Outside/Undercarriage
2. Inside/Outside Doors
3. RIght Side
4. Left Side
5. Front Wall
6. Ceiling/Roof
7. Floor (Inside) 7-POINT CONTAINER INSPECTION OUTSIDE / OUTSIDE / INSIDE DOORS RIGTH SIDE 4 LEFT SIDE UNDERCARRIAGE 1 Unusual repairs to structural 1 Unusual repairs to structural 1 Inspect prior to entering facility 1 Support beams should be visible 1 Secure and reliable locking beams. beams. 1 Repairs to the walls on the inside of the container must be visible on the outside. 1 Use tool to tap side walls. Listen I Repairs to the walls on the inside of the container must be visible on the outside. 1 Use tool to tap side walls. Listen mechanisms I Look for different color bonding material 1 Loose Bolts 1 Plates and repairs & feel for hollow sound! & feel for hollow sound! FRONT WALL 6 CEILING / ROOF FLOOR INSIDE 1 Blocks and vents are visible 1 Use tool to tap front wall. Listen and fell for 1 Ceiling is a certain height from floor. Blocks & vents are I Floor should be a certain height from the visible. I Uncomfortable feeling inside container. I Repairs to the ceiling on the inside of the container ceiling hollow sound! I Floor should be flat. Do not need to step up I Range finder, measuring tape and/or string to get inside! can be utilized to determine the length of I Different floor heights I Unusual repairs should be visible on the outside. container. I Use tool to tap ceiling. Listen for hollow sound. CEILING / ROOF FRONT WALL RIGHT SIDE LEFT SIDE OUTSIDE / UNDERCARRIAGE INSIDE / OUTSIDE DOORS FLOOR (INSIDE) REGIOLOGISTICS CFAT Zameshis Aaais ans www.regiologistics.com source: http://www.cisnav.com/custom/docs/C-TPAT.pdf
C-TPAT 7 Point Container Inspection
Source
http://www.r...es-c-tpat/Category
TransportationGet a Quote